The arc steelmaking furnace DSP-25 and forging complex with a 2000-ton press and manipulator were transferred for service. Equipment modernization increased quality and productivity, and automation and control systems were implemented.
DSP-25 Arc Steelmaking Furnace
The transfer of the DSP-25 arc steelmaking furnace for service included a full diagnostic and modernization of the existing equipment. The furnace, used for steel melting, was equipped with new control and automation systems, which significantly improved the quality of the final products.
Forging Complex (2000-ton press and left manipulator)
The forging complex, featuring a 2000-ton press and left manipulator, also underwent significant improvements.
During the service, a comprehensive inspection of all components and assemblies was conducted, along with scheduled preventive maintenance. This significantly reduced the number of unexpected breakdowns and enhanced the overall reliability of the production lines. Additionally, staff received training on operating the new equipment, and modern quality control methods were introduced.

